Suzanne Corvelli sat on Barn Ridge Road in Rockville one day last week, waiting to make a right turn out of her neighborhood into a solid wall of cars backed up on Norbeck Road. The traffic jam wouldn’t disperse until about a mile from her home, where the cars passed the InterCounty Connector, Maryland’s newest toll road and a thorn in the side of some local residents who blame it for Norbeck Road’s traffic woes. Norbeck Road (Route 28) has its own built-in disadvantages — the portion between Georgia Avenue and Layhill Road slims down from four lanes to two. With cars merging at bottlenecks in either direction, residents say traffic on the road has always been poor, but has become even worse since ICC construction began in 2008. “Norbeck has been bumper-to-bumper ever since construction started, and it’s changed from rush-hour to all-day traffic,” Corvelli said. “It’s always been heavy, but it’s gotten a lot worse,” even more so since the ICC first opened to the public on Feb. 23.
Rush-hour backups on Norbeck Road, sometimes a mile long, are now commonplace, and residents like Corvelli are at the mercy of other drivers when trying to turn onto the road from their homes or from the road into their driveways.