APNewsBreak: FAA felt offshore wind farm pressure

Published



BOSTON (AP) — Federal Aviation Administration employees felt political pressure to approve a wind farm planned off Cape Cod and did so amid internal disagreement over the best way to stop the turbines from interfering with radar and compromising airplane safety, according to FAA documents obtained by the project’s opponents.

The FAA ultimately decided that the key to safety was modifying the existing radar system at a nearby airfield, rather than ordering an extensive replacement, as recommended by its technical operations team. A replacement could have jeopardized the long-awaited Cape Wind project, which aims to be the nation’s first offshore wind farm, by delaying it three to four years.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.