“Concurrency” in defense programs – that is, overlapping development and production of weapons systems – has long been a controversial Pentagon practice. Not surprisingly, inventing something while beginning to build it, particularly something as complex as a modern warship, aircraft, or combat vehicle, introduces the risks of schedule delays and cost overruns. At the same time, the rapid fielding of a still-to-be-perfected system can create or preserve an advantage on the battlefield; it’s the technological equivalent of getting there “the fastest with the mostest.”
Now the Obama Pentagon is threatening to rewrite the procurement rules in a way that would make it extremely difficult to have the option of concurrent development and production.
Stay informed.Stay ahead.
Join Washington Examiner for unlimited access to the news, analysis, and commentary that matter most.
Already a member? Log in
