Metro: Bethesda elevators await inspection to reopen

Published



The elevators at Metro’s Bethesda station remain shuttered after a long-delayed rehabilitation project — even though the repair work is actually already finished.

The problem: Metro says it needs a state inspection to reopen them.

Full midterm coverage.Deeper analysis.

Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

Get Unlimited Access

Cancel anytime.