Examiner Local Editorial: Labor agreement not only problem with Dulles Rail

Published



Was it a coincidence that the day after Wisconsin Gov. Scott Walker emerged victorious from a union-backed recall effort, the Metropolitan Washington Airports Authority threw in the towel on its mandatory project labor agreement, or PLA, for Phase 2 of Dulles Rail? The 11-1 vote June 6 reversed the MWAA Board’s official policy, which gave a 10 percent preference to unionized construction firms that bid on the transit project in right-to-work Virginia.

The sudden about-face was even more remarkable given MWAA’s defiant resistance as recently as last month, even after the Virginia General Assembly voted to withhold $150 million if the union-favored incentives remained. Although jettisoning the PLA removes one major obstacle, many other problems remain — including the Washington Metropolitan Area Transit Authority’s unionized labor force. As Loudoun Supervisor Ken Reid pointed out, opting into Phase 2 will “forever expose our county’s taxpayers to … ever-rising wages and costly benefits Metro is unable to control.”

Full midterm coverage.Deeper analysis.

Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

Get Unlimited Access

Cancel anytime.