ICC logs a third of initial traffic after tolls levied

Published



The number of vehicles using the Intercounty Connector has plummeted to just over a third of the level taking test drives during the Montgomery County toll road’s free trial period.

Full midterm coverage.Deeper analysis.

Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

Get Unlimited Access

Cancel anytime.