D.C. proceeds with bridge project despite preservation group’s suit

Published



The District is moving ahead with plans to replace the 11th Street bridges that span the Anacostia River in Southeast Washington, even as a local historic preservation group is suing to stop the project.

Mayor Adrian Fenty on Friday announced that the city had selected a contractor for the $300 million project to replace what the city has called “deficient” bridges.

Full midterm coverage.Deeper analysis.

Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

Get Unlimited Access

Cancel anytime.