Demolition delayed for historic Reno bridge

Published May 27, 2014 8:05pm ET



RENO, Nev. (AP) — A century-old bridge crossing the Truckee River in downtown Reno is going to be around a little longer than expected.

The historic Virginia Street Bridge’s date with a wrecking ball has been postponed until at least late summer and perhaps into next year because of a delay in federal permitting for the Truckee River flood project.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.