Putin angry over Sochi Olympics cost overruns

Published



SOCHI, Russia (AP) — A year before the 2014 Winter Olympics are to begin, President Vladimir Putin has demanded that a senior member of the Russian Olympic Committee be fired, apparently due to cost overruns in host city Sochi — a demand certain to be fulfilled.

The current price tag for the Sochi Games is 1.5 trillion rubles ($51 billion), which would make them the most expensive games in the history of the Olympics — more costly even than the much-larger Summer Olympics held in London and Beijing.

Full midterm coverage.Deeper analysis.

Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

Get Unlimited Access

Cancel anytime.