Cold weather cracks 2 rails on Metro, causing delays

Published



Examiner Archives
  • Metro escalator closure scheduled for Dupont Circle in February (11/29/11)
  • Metro meltdown: Normal service resumes after hundreds get stuck (12/20/11)
  • Examiner Local Editorial: Metro hikes fees as ridership plummets (12/19/11)
  • Metrorail riders faced a hassle-filled commute Wednesday morning when problems hit four out of five lines on the second workday of the new year.

    Most of the problems were caused by two cracked rails. Though the fractures measured less than about 4 inches each, they caused major backups on the Yellow and Red lines, and led to delays for Green and Blue riders.

    Full midterm coverage.Deeper analysis.

    Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

    Get Unlimited Access

    Cancel anytime.