Biden’s looking at the wrong part of California’s train system for a model

Published April 7, 2021 9:20pm ET



When California first authorized a network of high-speed trains connecting San Francisco to Los Angeles, George W. Bush was still president. More than a decade later, the bullet train has proven a nearly $100 billion failure. The state now says that the train, which was supposed to be completed by 2022, still won’t be ready for almost another decade, and rather than connecting San Fran and LA, the train will connect Merced to Bakersfield.

Evidently, President Joe Biden considers this a model. As a part of his push for (another) multitrillion-dollar spending package, this time for infrastructure, Biden mused about applying a Manifest Destiny of sorts to trains.

Already a print subscriber? Click here to login/register your account

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.