Cape Wind: survey work starting at project site

Published



BOSTON (AP) — The Cape Wind offshore wind project is set to begin an extensive survey of the area in Nantucket Sound where they plan to build a 130-turbine wind farm.

The survey begins Friday and continues through early fall. The first step involves acoustic imaging to map the seafloor. Then, sampling will be done ensure no Native American artifacts will be disturbed and to analyze the soil, followed by deeper soil borings.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.