Examiner Editorial: Faster federal energy permits would boost jobs, revenues

Published



Remember last October when President Obama incessantly blasted congressional Republicans for the government shutdown? Among the lengthy litany of evils he claimed would result from the shutdown were delays in issuing leasing permits for energy exploration and development on federal lands. But, as the Institute for Energy Research pointed out in a letter Wednesday to House Budget Committee Chairman Paul Ryan, R-Wis., federal permit applications under this administration require 228 days to be processed on average. The 16-day shutdown delay pales by comparison to the chronically glacial pace maintained by the federal government under Obama.

“This ‘permatorium’ has led to a 15 percent drop in oil and natural gas production on federal lands since 2010. At the same time, natural gas and crude oil production on state and private lands have increased about 15 and 33 percent, respectively,” IER President Thomas Pyle told Ryan. Not coincidentally, the average processing time for a state permit in Texas is five days. As Gov. Rick Perry would say, there is a useful lesson for Obama in the contrast between how permit applications are processed in Washington, D.C., and Austin, Texas.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.