Work begins in Va. to remove sludge from NC spill

Published



DANVILLE, Va. (AP) — The removal of a 2,500-ton deposit of coal ash in the Dan River from a spill in North Carolina has begun in Danville.

The toxic sludge measuring 350-by-20-yards and about 1 foot deep collected at the Schoolfield Dam after the massive Feb. 2 spill. Work began Monday and should be completed in late June.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.