Fort Peck Dam repairs from flooding to cost $42.9M

Published



BILLINGS, Mont. (AP) — The U.S. Army Corps of Engineers has approved spending more than $42.9 million to repair damages to Fort Peck Dam after the record 2011 flooding that broke levees and swamped homes along the Missouri River.

It is part of $234 million slated for more than 100 projects to stabilize dams and levees from Fort Peck to the river’s junction with the Mississippi River.

Full midterm coverage.Deeper analysis.

Get unlimited access to Washington Examiner's reporting, expert analysis, and coverage of the midterm elections.

Get Unlimited Access

Cancel anytime.