Vermont uses new technology to speed bridge repair

Published



MONTPELIER, Vt. (AP) — Last month, construction crews placed a series of hollow tubes over the Wanzer Brook in Fairfield as part of a Vermont Transportation Agency program that uses new technology to cut construction time, save money and reduce the backlog of bridges that need replacement.

The tubes, made of material that is impervious to the elements, have since been filled with concrete and construction crews are laying a deck across the top. The bridge, just under 35 feet long, should be ready for traffic within a few weeks, a fraction of the time it would take to build a traditional bridge.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.