Rock blasting set on drought-plagued Miss. River

Published December 18, 2012 2:08am ET



ST. LOUIS (AP) — Barge operators along a key stretch of the Mississippi River braced Monday for months of restricted shipping as crews prepared to begin blasting large rock formations that are impeding navigation on the drought-plagued waterway.

Contractors from Iowa and Ohio could begin drilling holes into the troublesome Mississippi River bedrock south of St. Louis and detonating explosives inserted inside as early as Tuesday, the Army Corps of Engineers said. They expect to remove enough rock to fill about 50 dump trucks, possibly more.

Already a print subscriber? Click here to login/register your account

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.