Issues with soil contamination could delay Route 1 project

Published



The start of construction on a long-awaited expansion of traffic-clogged U.S. Route 1 in Dumfries faces extensive environmental issues related to the string of auto body shops and gas stations along the route that could add delays and new costs.

At least 31 of the 80 properties along the half-mile expansion area between Joplin Road and Bradys Hill Road have contaminated soil that must be cleaned up before the road can be widened from four lanes to six lanes.

Trusted reporting.Unlimited access.

Subscribe for full access to Washington Examiner coverage, expert political analysis, and subscriber-only journalism.

Get Unlimited Access

Already a member? Log in

Cancel anytime.